I want The Hub to have the ability to work with password protected Staging sites (Flywheel) so that I can manage my updates/performance and test modifications directly on the staging site and once all updates are working properly I would push the staging site to production, where I can then run and automate reports for the production site and email to the client on a schedule. I have a staging workflow to mitigate risks for updates and revisions, but the client only cares of how his production site is performing in terms of reporting. Can this be pushed to the top priority of your roadmap or provide a temporary fix to add credentials for a password-protected staging site to the hub. This would make the Hub absolutely awesome.
- Rafael
- Flash Drive
[Reports] Seamless Hub workflow from staging to production sites
0